INSTRUCTIONS
Cast on 8 sts in ewrap and prepare to work a flat panel.
Row 1: Ewrap knit to end. Row 2: Purl to end.
Repeat Row 1 and Row 2 until 20” of yarn remain.
Bind off with Basic Bind off method. Weave ends in.
HOW-TO Cast On
Place the slipknot on the first peg on the right side of the Zippy loom. Moving from right to left, wrap the working yarn around 2nd peg in counterclockwise direction. Repeat with the remaining pegs.
Ewrap Stitch
Begin Ewrap stitches from left to right on the Zippy loom. From the last peg, wrap this same peg again in a counterclockwise direction. The working yarn is now between this peg and the next peg, wrap the next peg in clockwise direction. Repeat wrapping the remaining pegs in a clockwise direction. Each peg should now have 2 loops.
Insert the hook from top of loop, grab working yarn and pull under loop and lift off peg. Replace the new loop onto peg.
The Purl stitch is used in combination with the Ewrap or the Knit Stitch or the stitch to prevent a knitted piece from curling.
Starting with the last peg (where the working yarn is located), with your fingers (or knitting hook) take the bottom loop up and over/off the peg. Repeat with the remaining pegs. One loop should remain on each peg.
Purl Stitch
This stitch is the reverse of the knit stitch. Place working yarn below the loop on the peg being worked.

LOOM: (2) Zippy Looms, 8 pegs.
YARN: Loops and Threads, Chunky Braid (1 Skein).
NOTIONS: Knitting tool, crochet hook to weave in ends, scissors.
SIZE: approx 6.5” x 44” Time to knit: 40 minutes